Cancelled Ski World Cup: the organiser’s claims against the resort operator

Who bears cancellation losses when a race slope is late or unsafe? Assess contractual duties, weather clauses, subcontractors and evidence under Austrian law.

Your personal attorney

Mag. Christopher Angerer, Rechtsanwalt

Your lawyer for ski and alpine accidents

Ski and alpine accidents are complex and emotional. One lawyer you know, from the first question to the courtroom. Strong practical background (former ski instructor, mountain rescuer and dog handler).

In larger cases, the work is handled as a team (lawyer, trainee lawyer, legal assistant). Court hearings and negotiations always remain a matter for the lead lawyer.

29 October 2026 · Mag. Christopher Angerer, Rechtsanwalt

Where a culpable breach of a contractual duty causes a provable loss, the organiser may claim damages from the resort operator if a Ski World Cup race is cancelled. Decisive are the agreed provision of the slope, the allocation of weather risk, and the specific reason for cancellation. Liability is not established by cancellation alone.

Who holds each claim must also be established by event companies, rights holders and sponsors. An entity that incurred costs is not necessarily the operator’s contractual counterparty. The assessment therefore starts with the companies involved and their contracts. This article addresses economic claims under Austrian law, rather than reporting a particular race cancellation.

What needs assessing after your race cancellation?

The selection identifies the records needed. It does not determine liability.

Would you like advice on claims after the cancellation? Continue to the enquiry form.

01 Question 1

What needs clarification first?

Your starting point

The next points to check.

01

Clarify contractual risk allocation

Collect the event agreement, annexes and amendments. Have the performance promise and weather clause assessed together.

02

Compare performance and cancellation grounds

Preserve acceptance records, slope conditions, weather data and the cancellation record. The comparison is with timely and safe performance.

03

Document each loss item

Allocate invoices, repayment obligations and revenue projections. Examine savings, remaining value and each company’s own losses separately.

What slope had to be provided, and by when?

Contractual interpretation under § 914 ABGB considers the parties’ intention and honest commercial practice. Read the event agreement, specification, and annexes together to determine whether the operator promised a particular course, race-ready grooming, snowmaking, or specified safety installations. The question is whether a result was promised by a fixed deadline or only a defined activity. Amendments and approved changes may alter the scope and timing of the duties.

The agreed suitability for competition is not established by suitability for ordinary skiing. Nor does sporting approval automatically confirm that every contractual duty was fulfilled. Acceptance records should identify what was checked, any reservations, and responsibility for remedial work. A separate allocation of contractual responsibility is required for each of the following: missing fences, delayed grooming, and unfinished access arrangements.

Separate weather risk from the decision to cancel

The economic consequences of insufficient snow, storms, or warm temperatures may be allocated by a weather clause. Examination is required of its wording, the contractual purpose, and any guarantees. A reference to force majeure alone does not remove every duty or damages claim. The relevant questions are whether the event falls within the clause and which notification, precautionary, or adjustment duties remain applicable.

Where a defect left by the operator could have been remedied in time, that breach is not automatically erased by subsequent bad weather. Whether a recoverable loss was caused nevertheless depends on what would have happened with proper performance. A necessary safety-related cancellation is not in itself an admission of liability. Nobody must run an unsafe race to preserve economic claims.

Identify the roles of operator, organiser and subcontractors

The company that promised to provide the slope to the claimant must first be identified. Where the operator employs a grooming or safety contractor to fulfill that obligation, § 1313a ABGB renders the operator answerable for the contractor’s fault in performance as if it were the operator’s own. Consequently, subcontracting does not automatically transfer contractual responsibility to the service provider. Duties assumed by the organiser must be considered separately.

A direct contractual claim against the subcontractor is not granted to the organiser by § 1313a ABGB alone. Its own legal basis is required for such a claim. General non-contractual slope safety duties do not automatically cover all purely economic losses from a cancelled event. Individual examination is required for separate contracts, protected legal interests, and the purpose of the duty breached. The same applies to sponsors and rights holders outside the operator agreement.

Could the race have proceeded with timely performance?

For every loss item, the link between breach and damage must be established. Generally, the burden of proving damage and causation rests with the organiser; § 1298 ABGB concerns the operator’s proof of absence of fault. In 4 Ob 60/25i of 26 March 2026, the Austrian Supreme Court reaffirmed this distinction. That case concerned delayed flat renovation after a fire, not a ski race. Its relevant point is identifying which losses the defective contractual performance actually caused.

The agreed completion date, actual slope condition, weather developments, inspections, and cancellation decision are connected by a reliable chronology. The claimed cancellation loss may be defeated if an independent storm would have prevented the event even with timely and safe provision of the slope. Separate assessment is required for additional costs already caused beforehand. This comparison or the technical records cannot be replaced by a cancellation press release.

Prove cancellation costs and lost profit item by item

§ 1293 ABGB distinguishes actual loss from lost profit. Wasted preparation expenditure, necessary additional costs, and repayments legally owed to contractual partners may be included as items for assessment. Evidence of the reason, amount, payment obligation, and connection to the operator’s performance is required for each item. The company that suffered the loss must be identified. A sponsor’s loss listed in a demand does not become the organiser’s own damage.

Lost revenue is not lost profit. The calculation must include saved variable costs, remaining value, and alternative use, and the same item must not be counted twice. Within the scope of § 349 UGB, lost profit is included as recoverable damage between entrepreneurs. Examination is still required for entrepreneur status, the applicability of the UGB, and effective liability limitations. Outside that rule, the extent of compensation under §§ 1323 and 1324 ABGB is particularly relevant.

Which records now support the claim or defence?

The complete agreement, annexes, amendments, and correspondence regarding changes to deadlines or performance must be preserved. Acceptance and inspection records, dated photographs, weather forecasts and measurements, and reports on snowmaking, grooming and safety defects must be added. The cancellation record should show who decided what, when, and on which factual basis. Original files and their timestamps matter more than subsequently shortened summaries.

Invoices, cancellation terms, repayments and revenue projections must be allocated to the relevant loss. Warnings, outstanding cooperation by the organiser and reasonable loss-reduction measures must also be recorded. Compensation may be reduced under § 1304 ABGB by the claimant’s own culpable conduct. Individual review is required for contractual notification requirements, deadlines and insurance terms before an admission, set-off or settlement. Mag. Christopher Angerer uses these records to assess the defendants, evidence strategy and defensible scope of compensation.

FAQ

Questions about contractual liability after race cancellation

Does bad weather automatically release the operator? +

Decisive are the contractual allocation of risk and the particular cause of the loss. Claims may be limited by weather covered by a clause. Separate assessment is still required for earlier breaches and the additional costs already caused by them. These questions are not resolved by a blanket reference to force majeure.

Can the organiser claim directly against the grooming contractor? +

An independent legal basis is needed. The operator owing contractual performance has the contractor’s fault attributed to it by § 1313a ABGB. A direct contractual claim against its subcontractor is not created by this alone. Individual examination is required for separate contracts and other possible grounds of liability.

Does signed acceptance exclude later claims? +

The contract, the subject of acceptance and the recorded declarations determine the answer. One must distinguish a documented condition check, known reservations, and an agreed settlement of claims. A comprehensive waiver is not automatically established by a signature; rather, the complete record is decisive.

Had an accident?

The sooner we secure the evidence, the better we can enforce your claim. Call us directly or send an email, callback within one business day.

Contact

A direct line to the firm.

Address

BRANDAUER Rechtsanwälte GmbH Giselakai 51 5020 Salzburg